Before delivery
Operating checks, inspection records, manuals and protected packing preparation.
Factory testing, commissioning guidance, maintenance support and replacement parts help keep WALI equipment working around the real demands of your operation.

Operating checks, inspection records, manuals and protected packing preparation.
Remote or project-specific guidance for mechanical setup, electrical connection and operator preparation.
Practical troubleshooting through email, WhatsApp and video communication with the WALI team.
Identification and supply of blades, screens, bearings, seals, wear plates and relevant electrical components.
01 / TESTINGCritical operating and protection functions are checked before equipment leaves the manufacturing base.
02 / DELIVERYPacking, protection and container loading are planned around the machine and destination.
03 / PARTSMachine model, serial number, part number and photos help our team confirm the correct replacement.
Representative factory records showing equipment protection, loading and dispatch for domestic and international projects.
The images document the loading process at our facility, featuring reinforced waterproof film packaging to guarantee safe, damage-free transit over long distances. The equipment has now arrived at its destination safely, and we will continue to provide ongoing installation guidance and technical support.
After 40 days of precision manufacturing, the heavy-duty dual-shaft shredder is officially shipping to the customer's site today. The photos show the actual loading and delivery process. The equipment has been properly reinforced and protected to ensure safe arrival.
This single-shaft shredder was supplied to a customer in Nantong, China, for onward export to Russia.
This compact double-shaft shredder is ready for shipment to our client. The machine is securely packed in wooden cases to withstand long ocean transit. The photo shows the final loading process at our facility.
Following 50 days of precision manufacturing and full-load testing, all performance metrics of the equipment have fully met the standards. The images document the actual loading and delivery process, with proper securing and moisture-proof measures in place to guarantee safe arrival.
After 40 days of precision manufacturing, the heavy-duty dual-shaft shredder is officially shipping to the customer's site today. The photos show the actual loading and delivery process. The equipment has been properly reinforced and protected to ensure safe arrival.
Include the machine model, serial number, photos, alarms and a short description of the operating condition.